Ride On Mower Battery Installation Guide

This is your complete guide to installing your Quake Battery.

You will need some tools for the following. 

Step 1: Ensure the vehicle is turned off the key is out of the ignition.

Step 2: Disconnect the negative terminal. Followed by the battery hold down if needed.

Step 3: Disconnect the positive terminals and remove battery.

Step 4: Install new battery the same one the old one came out. 

Step 5: Re-connect the positive terminal followed by the negative terminal. Ensure both bolts are done up tight. Replace the hold down if removed.

Step 6: From here you are able to insert the key and turn the vehicle on.

This is just a guide. Always refer to the user manual or ask a professional for installation guidance.

Share This Post

More To Explore

Shopping Cart

Deep Cycle Sale on NOW!!

20% all GEL/AGM & LifePo4 Batteries.

Scroll to Top

Discover more from Quake Batteries

Subscribe now to keep reading and get access to the full archive.

Continue reading